Chen, Z, Li, H and Wong, C T C (2000) Environmental Management of Urban Construction Projects in China. Journal of Construction Engineering and Management, 126(04), 320–4.

Crowley, L G (2000) Friedman and Gates—Another Look. Journal of Construction Engineering and Management, 126(04), 306–12.

Drexler, J A and Larson, E W (2000) Partnering: Why Project Owner-Contractor Relationships Change. Journal of Construction Engineering and Management, 126(04), 293–7.

Dunston, P S, Savage, B M and Mannering, F L (2000) Weekend Closure for Construction of Asphalt Overlay on Urban Highway. Journal of Construction Engineering and Management, 126(04), 313–9.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(313)
  • Abstract:
    Construction of asphalt overlays for urban highways is generally restricted to off-peak hours, often exclusively nighttime hours, and to partial closures to minimize public inconvenience. Such constraints are thought to adversely affect production and quality. In August 1997, the Washington State Department of Transportation implemented a pilot project to evaluate the option of a full weekend closure—closure of all lanes in a single direction throughout designated weekend hours—as an alternative to nighttime closures. Two concerns were consistent construction quality between nighttime and daytime paving and general comparison of the full weekend closure with other closure strategies. Surface smoothness (rideability) and in-place density were compared between nighttime and daytime mainline paving for this project, and gradation and asphalt cement content variabilities were compared with published average values. Production rates were compared to those from a comparably sized nighttime project. The investigation revealed that consistent quality, exceeding reported average values, may be achieved. High paving production rates resulted from close proximity of the hot mix plant to the work zone.

Hiyassat, M A S (2000) Modification of Minimum Moment Approach in Resource Leveling. Journal of Construction Engineering and Management, 126(04), 278–84.

Javid, M and Seneviratne, P N (2000) Investment Risk Analysis in Airport Parking Facility Development. Journal of Construction Engineering and Management, 126(04), 298–305.

Koo, B and Fischer, M (2000) Feasibility Study of 4D CAD in Commercial Construction. Journal of Construction Engineering and Management, 126(04), 251–60.

Maio, C, Schexnayder, C, Knutson, K and Weber, S (2000) Probability Distribution Functions for Construction Simulation. Journal of Construction Engineering and Management, 126(04), 285–92.

Molenaar, K, Washington, S and Diekmann, J (2000) Structural Equation Model of Construction Contract Dispute Potential. Journal of Construction Engineering and Management, 126(04), 268–77.

Thomas, H R (2000) Schedule Acceleration, Work Flow, and Labor Productivity. Journal of Construction Engineering and Management, 126(04), 261–7.